- ICH GCP
- Amerikanska kliniska prövningsregistret
- Klinisk prövning NCT07589387
Hypertension Treatment in Nigeria: Hypertension Diabetes Integration Study- Formative Aim 3 (HTN2)
Transforming Hypertension Treatment in Nigeria Using a Type II Hybrid, Interrupted Time Series Design - Aim 3
Studieöversikt
Status
Betingelser
Intervention / Behandling
- Övrig: Implementation of program based on WHO HEARTS-D guidelines
- Läkemedel: Metformin
- Läkemedel: Glimepiride
- Enhet: Point-of-care blood glucose monitor (glucometer) and compatible test strips
- Beteende: HEARTS-D training and quarterly supportive supervision for community health extension workers (CHEWs)
Studietyp
Inskrivning (Beräknad)
Fas
- Inte tillämpbar
Kontakter och platser
Studiekontakt
- Namn: Dike Ojji, MD
- Telefonnummer: +234-806-009-4456
- E-post: dike.ojji@uniabuja.edu.ng
Studera Kontakt Backup
- Namn: Mark Huffman, MD
- E-post: m.huffman@wustl.edu
Deltagandekriterier
Urvalskriterier
Åldrar som är berättigade till studier
- Vuxen
- Äldre vuxen
Tar emot friska volontärer
Beskrivning
Inclusion Criteria:
- Aim 3 Inclusion Criteria:
Patients will be screened for diabetes with symptoms of hyperglycemia or BMI >25 kg/m2 and over the age of 18 years old. Upon first or previous diagnosis, diabetes patients will be registered.
- Adults (≥18 years),
- Patients with previous diabetes diagnosis
- Patients with persistently elevated random glucose >200 mg/dl, fasting glucose >126 mg/dl, or hemoglobin A1c >6.5% on two or more occasions (when available)
- Patients taking glucose lowering medications
- Pregnant women are eligible for this program, or
- Cognitively impaired adults are eligible for this program.
Exclusion Criteria:
- This program will not include any of the following special populations:
- Individuals who are not yet adults (minors): i.e. infants, children, or teenagers <18 years old, or
- Prisoners or other detained individuals.
Studieplan
Hur är studien utformad?
Designdetaljer
- Primärt syfte: Hälsovårdsforskning
- Tilldelning: N/A
- Interventionsmodell: Enskild gruppuppgift
- Maskning: Ingen (Open Label)
Vapen och interventioner
Deltagargrupp / Arm |
Intervention / Behandling |
|---|---|
|
Experimentell: Primary Health Care Centers in the Federal Capital Territory
10 primary healthcare centers in Nigeria's Federal Capital Territory who previously demonstrated capacity to deliver hypertension care in HTN 1.0.
|
This study uses an interrupted time series design to compare diabetes screening, diagnosis, treatment, and control across a 12-month pre-implementation period and a 24-month implementation period in 10 primary healthcare centers in Nigeria's Federal Capital Territory.
Sites previously demonstrated capacity to deliver hypertension care and will continue hypertension services while expanding to diabetes care through the HEARTS diabetes module (HEARTS-D).
Pre-implementation includes registry setup and provision of glucometers without diabetes treatment training.
Implementation includes HEARTS-D training, supply provision, expansion of the drug revolving fund to diabetes medicines, and quarterly supportive supervision.
Description: Oral biguanide used as first-line glucose-lowering therapy within the HEARTS-D stepped-care protocol.
Dosing per protocol: 500 mg once daily (Step 1), 1000 mg once daily (Step 2), 1000 mg twice daily (Step 3 and Step 4).
Supplied through the expanded drug revolving fund during the implementation period.
Oral sulfonylurea used as add-on therapy at Step 4 of the HEARTS-D stepped-care protocol when blood glucose remains uncontrolled on metformin.
Starting dose 1 mg once daily, titrated by 1-2 mg to a maximum of 8 mg daily.
Supplied through the expanded drug revolving fund during the implementation period.
Point-of-care capillary blood glucose monitor with compatible single-use test strips and lancets, used at participating primary health centers for diabetes screening, diagnosis, and monitoring per WHO HEARTS-D.
Glucometers and test strips are provided to all sites during pre-implementation (registry setup) and replenished during implementation through the supply chain and drug revolving fund.
Andra namn:
Structured training of CHEWs on the HEARTS-D protocol covering diabetes screening, diagnosis, stepped-care treatment, follow-up, and referral, delivered at the start of the implementation period and reinforced by quarterly supportive supervision visits with audit-and-feedback throughout the 24-month implementation period.
Andra namn:
|
Vad mäter studien?
Primära resultatmått
Resultatmått |
Åtgärdsbeskrivning |
Tidsram |
|---|---|---|
|
Dose of quarterly supportive supervision visits measured by the proportion of observed/expected visits during the implementation period.
Tidsram: 36 months
|
Primary Implementation Outcome: Description: Dose of quarterly supportive supervision visits measured by the proportion of observed/expected visits during the implementation period.
|
36 months
|
|
Difference in 6-month rolling average diabetes screening in eligible adults (random plasma glucose with hyperglycemia symptoms; fasting plasma glucose if ≥18 y and BMI >25 kg/m²; or HbA1c) per WHO HEARTS-D, pre- vs. implementation
Tidsram: 36 months
|
Primary effectiveness outcome: The primary outcome will be the difference in the 6-month rolling average of the diabetes screening among eligible patients, screening defined as a random plasma glucose screening among adults with symptoms of hyperglycemia or a fasting plasma glucose among adults > 18 years old and body mass index > 25 kg/m2 in accordance with HEARTS-D, between the pre-implementation and implementation periods.
Hemoglobin A1c may also be used if available.
|
36 months
|
Sekundära resultatmått
Resultatmått |
Åtgärdsbeskrivning |
Tidsram |
|---|---|---|
|
Difference in 6-month rolling average diabetes treatment (proportion of eligible patients prescribed any glucose-lowering medication) between pre-implementation and implementation periods
Tidsram: 36 months
|
Secondary Effectiveness Outcome (diabetes treatment): 6-month rolling average of diabetes treatment levels in the pre-implementation and implementation periods.
|
36 months
|
|
Difference in 6-month rolling average blood sugar control (per WHO HEARTS-D: fasting plasma glucose <126 mg/dL, postprandial <160 mg/dL, or HbA1c <7%) between pre-implementation and implementation periods
Tidsram: 36 months
|
Secondary Effectiveness Outcome (blood sugar control): 6-month rolling average of blood sugar control in the pre-implementation and implementation periods.
Control will be defined according to the WHO HEARTS-D module2, specifically: fasting glucose <126 mg/dl, postprandial glucose <160 mg/dl, or HbA1c <7%.
|
36 months
|
|
Difference in 6-month rolling average mean fasting plasma glucose (mg/dL) between pre-implementation and implementation periods
Tidsram: 36 months
|
Secondary Effectiveness Outcomes (mean fasting glucose levels): 6-month rolling average of mean fasting glucose levels in the pre-implementation and implementation periods.
|
36 months
|
|
Proportion of selected primary health centers (PHCs) that participated in baseline diabetes training (A ÷ B; A = PHCs that participated, B = total selected PHCs)
Tidsram: 36 months
|
Secondary Implementation Outcome: A = Number of PHCs who participated in baseline diabetes training B = Total number of selected PHCs Calculation: A ÷ B |
36 months
|
|
Proportion of selected PHCs that received at least one supportive supervision visit in the past 12 months (A ÷ B; B = total selected PHCs)
Tidsram: 36 months
|
Secondary Implementation Outcome: A = Number of PHCs who received at least one supportive supervision visit in the past 12 months B = Total number of selected PHCs Calculation: A ÷ B |
36 months
|
|
Proportion of eligible PHCs that received at least one audit-and-feedback report within the past 3 months (A ÷ B)
Tidsram: 36 months
|
Secondary Implementation Outcome: A = Number of PHCs who received at least an audit and feedback report within the past 3-months B = Total number of selected PHCs Calculation: A ÷ B |
36 months
|
|
Percentage of PHCs with a working blood glucose monitor on-site on the day of assessment (last supervision visit) (A ÷ B)
Tidsram: 36 months
|
Secondary Implementation Outcome: A = Number of PHCs with a working blood glucose monitor at the site on the day of assessment (time point: last supervision visit) B = Total number of selected PHCs Calculation: A ÷ B |
36 months
|
|
Percentage of PHCs with diabetes medicines available on-site on the day of assessment (last supervision visit) (A ÷ B)
Tidsram: 36 months
|
Secondary Implementation Outcome: A = Number of PHCs with diabetes medicines available on the day of assessment (time point: last supervision visit) B = Total number of selected PHCs Calculation: A ÷ B |
36 months
|
|
6-monthly rolling average percentage of registered diabetes patients with clinically indicated step-up who received step-up treatment within 6 months (A = patients needing and receiving step-up; B = patients registered per month)
Tidsram: 36 months
|
Secondary Implementation Outcome: A = Number of patients who need step up treatment and received it B = Total number of patients who are registered per month Calculation: A ÷ B, 6-monthly rolling average rate |
36 months
|
|
6-monthly rolling average monthly proportion of registered diabetes patients receiving appropriate stepped care, out of total registered patients (A ÷ B)
Tidsram: 36 months
|
Secondary Implementation Outcome: A = Number of patients who need step up treatment and received it B = Total number of patients who are registered per month Calculation: A ÷ B, 6-monthly rolling average rate |
36 months
|
Andra resultatmått
Resultatmått |
Åtgärdsbeskrivning |
Tidsram |
|---|---|---|
|
Difference in the proportion of patients with serious adverse events (SAEs) between pre-implementation and implementation periods
Tidsram: 36 months
|
Safety Outcome: between-period (pre-implementation versus implementation) differences in proportions of serious adverse events
|
36 months
|
|
Difference in the proportion of patients with adverse events of special interest (hypoglycemia, hyperglycemia, medication allergies, common medication side effects) between pre-implementation and implementation periods
Tidsram: 36 months
|
Safety Outcome: e.g., hypoglycemia, hyperglycemia, medication allergies, common medication side effects in pre-implementation and implementation periods.
|
36 months
|
Samarbetspartners och utredare
Studieavstämningsdatum
Studera stora datum
Studiestart (Beräknad)
Primärt slutförande (Beräknad)
Avslutad studie (Beräknad)
Studieregistreringsdatum
Först inskickad
Först inskickad som uppfyllde QC-kriterierna
Första postat (Faktisk)
Uppdateringar av studier
Senaste uppdatering publicerad (Faktisk)
Senaste inskickade uppdateringen som uppfyllde QC-kriterierna
Senast verifierad
Mer information
Termer relaterade till denna studie
Nyckelord
Ytterligare relevanta MeSH-villkor
Andra studie-ID-nummer
- UATH/HREC/PR/557/A3
- R01HL144708 (U.S.S. NIH-anslag/kontrakt)
Plan för individuella deltagardata (IPD)
Planerar du att dela individuella deltagardata (IPD)?
IPD-planbeskrivning
Tidsram för IPD-delning
Kriterier för IPD Sharing Access
IPD-delning som stöder informationstyp
- STUDY_PROTOCOL
- SAV
- ANALYTIC_CODE
Läkemedels- och apparatinformation, studiedokument
Studerar en amerikansk FDA-reglerad läkemedelsprodukt
Studerar en amerikansk FDA-reglerad produktprodukt
Denna information hämtades direkt från webbplatsen clinicaltrials.gov utan några ändringar. Om du har några önskemål om att ändra, ta bort eller uppdatera dina studieuppgifter, vänligen kontakta register@clinicaltrials.gov. Så snart en ändring har implementerats på clinicaltrials.gov, kommer denna att uppdateras automatiskt även på vår webbplats .