此页面是自动翻译的,不保证翻译的准确性。请参阅 英文版 对于源文本。

The Intensified Treatment Monitoring Strategy to Prevent Accumulation of Drug Resistance (ITREMA) Trial (ITREMA)

2022年5月10日 更新者:Dr. Annemarie Wensing、UMC Utrecht

Evaluation of an Intensified Treatment Monitoring Strategy to Prevent Accumulation and Spread of HIV-1 Drug Resistance in Low- and Middle-income Countries (ITREMA).

The ITREMA trial is an open-label randomized controlled trial (RCT) in which HIV-1 infected patients initiating first-line ART and already on first-line ART will be enrolled. Enrollment will continue until 600 patients have been randomized. Patients initiating ART will be randomized after six months of ART and patients already on ART will be randomized at 6 months after the last viral load measurement. Patients in both arms will receive study visits every three months for a total follow-up duration of 18 months after randomization to either of two study arms. The control arm will receive standard of care HIV-1 treatment monitoring during first-line ART in accordance with South African National Department of Health (NDoH) guidelines. The intervention arm will receive intensified treatment monitoring during first-line ART according to the treatment monitoring strategy under investigation.

研究概览

详细说明

This study will enroll adult HIV-1 infected patients who are about to initiate or have already initiated first-line ART. Patient enrollment and randomization will be performed at two different time points. Timing and criteria for enrollment and randomization are as follows:

  1. ART naïve patients: Patients are eligible for enrollment initiation of treatment with first-line ART. Randomization is performed after availability of the first routine viral load measurement, performed at month 6 of treatment.
  2. Patients on ART: Patients are eligible for enrollment after ≥ 1 year of virologically suppressive first-line ART and only if a last viral load with a result <1000 copies/mL was performed within the last 6 months. Randomization is performed 6 months after the last viral load (VL) result.

A total number of 600 patients will be randomized into two trial arms. The trial will be conducted on-site at one of the clinical facilities of Ndlovu Care Group (http://www.ndlovucaregroup.co.za/), one of the partners in the project. This facility, Ndlovu Medical Centre, is situated in the town of Elandsdoorn, Limpopo, South Africa, and provides medical service to local South African patients who are unable to pay medical insurance. The Ndlovu Care Group distributes antiretroviral medication in the framework of the South African Department of Health antiretroviral treatment programme. This clinic is currently providing ART to >3600 patients. Patients on ART return to the clinic monthly for collection of medication, pill count and adherence counselling, which allows intensification of monitoring without substantial change of the infrastructure or frequency of visits.

After randomisation, patients in both study arms will return for study follow-up visits on a three-monthly basis, at month 9, 12, 15, 18, 21 and 24 after start of ART or after the last VL measurement. In addition, patients will be called back for additional study visits (max. 2) in case of a detected viral load >1000 copies/ml during any of these visits. All visits in both arms, including aforementioned additional call back visits will coincide with standard of care medication collection visits to the clinic. In case of a switch to second-line therapy, patients in both arms will continue three-monthly follow-up visits in an observational manner, and guidelines for monitoring of second-line therapy are followed.

Control arm:

300 patients randomly assigned to this arm will be monitored in full concordance with current South African NDoH guidelines in use at the study site. Viral load measurements will be performed at month 12 and 24 after start of ART (for newly initiated patients) or at month 12 and 24 after the last viral load measurement (patients already on ART). If a viral load >1000 copies/ml is detected, the patient is called back for counseling for therapy adherence and repeat viral load measurement, 2 months after the initial viral load measurement. If the repeat viral load measurement is >1000 copies/ml after adherence counseling, this is taken to be indicative of therapy failure due to development of drug resistance and a switch to second line therapy is made, together with intensified adherence counseling, without verifying the cause of virological failure by performing drug level testing or drug resistance testing. If viral load drops to <1000 copies/ml after adherence counseling, the first line treatment is maintained.

Intervention arm:

300 patients randomly assigned to this arm will be monitored using the investigational intensified monitoring strategy. This strategy consists of 3-monthly viral load monitoring at month 9, 12, 15, 18, 21 and 24 (after start of ART in initiating patients or after the last viral load measurement in patients on ART). If a viral load measurement > 1000 copies/mL is detected, the patient will be called back for a follow-up study visit at the next monthly medication collection visit (4 weeks after detection of elevated viral load). Upon arrival drug level testing is performed, the viral load measurement is repeated, and a dried blood spot prepared and stored at room temperature. Procedures following this depend on the result of drug level testing:

  • If drug levels are detected by drug level testing, the result of the viral load measurement is awaited. If the repeat viral load is >1000 copies/ml, the dried blood spot is shipped directly by courier to the World Health Organization (WHO) reference laboratory for drug resistance testing. The reference laboratory will provide feedback by means of a digital resistance report to the coordinating research physician. The patient will be called back for a second follow-up study visit at the next monthly medication visit (8 weeks after detection of elevated viral load), either for prescription of second-line therapy or continuation of first-line therapy, guided by the result of resistance testing.
  • If drug level monitoring at the first follow-up visit indicates that drug levels are not detected, intensified counseling is performed at the same visit and first-line therapy will be maintained, regardless of the result of the repeat viral load measurement. The patient will not be called back and the next viral load will be performed at the next scheduled three-monthly time point. However, if the viral load result at this visit is again >1000 copies/ml, drug resistance testing will be performed regardless of the outcome of drug level testing.

研究类型

介入性

注册 (实际的)

501

阶段

  • 不适用

联系人和位置

本节提供了进行研究的人员的详细联系信息,以及有关进行该研究的地点的信息。

学习地点

    • Limpopo
      • Elandsdoorn、Limpopo、南非、0485
        • Ndlovu Medical Centre

参与标准

研究人员寻找符合特定描述的人,称为资格标准。这些标准的一些例子是一个人的一般健康状况或先前的治疗。

资格标准

适合学习的年龄

18年 及以上 (成人、年长者)

接受健康志愿者

有资格学习的性别

全部

描述

Inclusion Criteria:

  • HIV-1 infected male or female patients
  • For ART Naïve patients: Eligible for and intending to initiate ART at the clinical site
  • For patients on ART: On ART ≥1 year. Last VL <6 months ago and <1000 copies/mL
  • ≥18 years of age
  • Able to understand and willing to give informed consent

Exclusion Criteria:

  • Any serious unstable medical condition at study baseline
  • Any criteria that in the opinion of the investigator indicate that the patient is unable to participate in the full study.

学习计划

本节提供研究计划的详细信息,包括研究的设计方式和研究的衡量标准。

研究是如何设计的?

设计细节

  • 主要用途:其他
  • 分配:随机化
  • 介入模型:并行分配
  • 屏蔽:无(打开标签)

武器和干预

参与者组/臂
干预/治疗
有源比较器:Control
Standard of Care monitoring
Standard-of-care virological monitoring during first-line ART as described by WHO and South African National Department of Health ART guidelines, consisting of viral load monitoring at month 6 and 12 of ART and annually thereafter, followed-up by a repeat measurement within 3 months after a viral load >1000 copies/mL, during first-line antiretroviral treatment (ART) for HIV-1 infection as prescribed by South African national guidelines.
实验性的:Intervention
Intensified monitoring
Intensified virological monitoring during first-line ART with viral load monitoring at month 6 of ART and 3-monthly thereafter, followed-up consecutively by point-of-care qualitative drug level testing and drug resistance testing in case of a viral load >1000 copies/mL, during first-line antiretroviral treatment (ART) for HIV-1 infection as prescribed by South African national guidelines.

研究衡量的是什么?

主要结果指标

结果测量
措施说明
大体时间
Drug resistance
大体时间:week 48
Prevalence of drug resistance in patients with therapy failure in each arm
week 48
Drug resistance
大体时间:week 96
Prevalence of drug resistance in patients with therapy failure in each arm
week 96
Unnecessary treatment switches
大体时间:week 48
Number of virological failure cases without drug resistance in the intervention arm (averted unnecessary treatment switches) versus in the control arm (unnecessary treatment switches)
week 48
Unnecessary treatment switches
大体时间:week 96
Number of virological failure cases without drug resistance in the intervention arm (averted unnecessary treatment switches) versus in the control arm (unnecessary treatment switches)
week 96

次要结果测量

结果测量
措施说明
大体时间
Time on failing regimen
大体时间:week 96
Time during which viremia > 1000 copies/mL is maintained after the first instance of a viral load >1000 copies/ml
week 96
Loss of second line therapeutic options over time
大体时间:week 96
The loss of second line therapeutic options over time due to accumulation of resistance mutations in the presence of a failing regimen.
week 96
Influence of genotypic resistance testing
大体时间:week 96
Influence of genotypic resistance testing on the choice for a second line regimen by comparing chosen regimens in the intervention and control groups.
week 96

合作者和调查者

在这里您可以找到参与这项研究的人员和组织。

赞助

调查人员

  • 首席研究员:Annemarie MJ Wensing, MD, PhD、UMC Utrecht

出版物和有用的链接

负责输入研究信息的人员自愿提供这些出版物。这些可能与研究有关。

研究记录日期

这些日期跟踪向 ClinicalTrials.gov 提交研究记录和摘要结果的进度。研究记录和报告的结果由国家医学图书馆 (NLM) 审查,以确保它们在发布到公共网站之前符合特定的质量控制标准。

研究主要日期

学习开始 (实际的)

2015年6月29日

初级完成 (实际的)

2019年3月1日

研究完成 (实际的)

2022年5月1日

研究注册日期

首次提交

2017年9月28日

首先提交符合 QC 标准的

2017年11月23日

首次发布 (实际的)

2017年11月30日

研究记录更新

最后更新发布 (实际的)

2022年5月11日

上次提交的符合 QC 标准的更新

2022年5月10日

最后验证

2022年5月1日

更多信息

与本研究相关的术语

药物和器械信息、研究文件

研究美国 FDA 监管的药品

研究美国 FDA 监管的设备产品

此信息直接从 clinicaltrials.gov 网站检索,没有任何更改。如果您有任何更改、删除或更新研究详细信息的请求,请联系 register@clinicaltrials.gov. clinicaltrials.gov 上实施更改,我们的网站上也会自动更新.

HIV爱滋病的临床试验

Standard of care monitoring的临床试验

3
订阅