CALM- 2 - Controlling and Lowering Blood Pressure With the MobiusHD™ (CALM-2)

May 9, 2023 updated by: Vascular Dynamics, Inc.
The objective of this study is to evaluate the safety and effectiveness of the MobiusHD System in a prospective, randomized, double-blind, sham-controlled multi-center pivotal study.

Study Overview

Status

Active, not recruiting

Detailed Description

The objective of this study is to evaluate the safety and effectiveness of the MobiusHD System in a prospective, randomized, double-blind, sham-controlled multi-center pivotal study. Patients with resistant hypertension who remain uncontrolled despite pharmacologic treatment with maximum tolerated, guideline-directed anti-hypertensive pharmacologic therapy will be evaluated.

Study Type

Interventional

Enrollment (Anticipated)

300

Phase

  • Not Applicable

Contacts and Locations

This section provides the contact details for those conducting the study, and information on where this study is being conducted.

Study Locations

      • Nancy, France, 54035
        • CHU Nancy Centre Coeur et Vaisseaux
    • Georgia
      • Atlanta, Georgia, United States, 30308
        • Emory University Hospital Midtown
    • Illinois
      • Springfield, Illinois, United States, 62702
        • Southern Illinois University
    • Indiana
      • Indianapolis, Indiana, United States, 46290
        • St. Vincent Heart Center of Indiana
    • Louisiana
      • New Orleans, Louisiana, United States, 70121
        • Ochsner Medical Center
    • Ohio
      • Cincinnati, Ohio, United States, 45219
        • The Carl & Edyth Lindner Center for Research & Education at The Christ Hospital

Participation Criteria

Researchers look for people who fit a certain description, called eligibility criteria. Some examples of these criteria are a person's general health condition or prior treatments.

Eligibility Criteria

Ages Eligible for Study

18 years to 80 years (Adult, Older Adult)

Accepts Healthy Volunteers

No

Description

Inclusion Criteria:

  • Mean 24 hour ambulatory systolic blood pressure ≥145 mmHg and ≤200 mmHg and stable for at least 8 weeks on a maximally tolerated guideline directed, (JNC8) or their equivalent when those listed are not available dosing regimen consisting of up to 5 antihypertensive medications, with a minimum required dosing regimen of an "A+C+D" antihypertensive medication regimen, where "A" is an angiotensin-converting enzyme Inhibitor or an angiotensin receptor blocker, "C" is a calcium channel blocker, and "D" is a diuretic.

Exclusion Criteria:

  • Inadequacy of the carotid anatomy for treatment with the MobiusHD based on carotid angiography.

Study Plan

This section provides details of the study plan, including how the study is designed and what the study is measuring.

How is the study designed?

Design Details

  • Primary Purpose: Treatment
  • Allocation: Randomized
  • Interventional Model: Crossover Assignment
  • Masking: Triple

Arms and Interventions

Participant Group / Arm
Intervention / Treatment
Experimental: MobiusHD Implantation
The MobiusHD device is a self-expanding nitinol implant that is delivered intravascularly to the internal carotid sinus via the delivery catheter.
Sham Comparator: Sham Implantation
Sham Implantation

What is the study measuring?

Primary Outcome Measures

Outcome Measure
Measure Description
Time Frame
Primary Effectiveness Endpoint - Change in mean 24-hr sABP from baseline to 180-day
Time Frame: 180-day
The primary effectiveness endpoint is change in mean 24-hr ambulatory systolic blood pressure (24hr sABP) from baseline to the 180-day visit.
180-day

Other Outcome Measures

Outcome Measure
Measure Description
Time Frame
Safety Assessments - Composite measured at 90-day
Time Frame: 90-day
Composite measure of death, MI, stroke, device embolization, carotid occlusion, new ipsilateral carotid stenosis requiring surgical or percutaneous intervention, or Bleeding Academic Research Consortium (BARC) 3 or 5 bleeding events as adjudicated by CEC from randomization through the 90-day visit. All adverse events.
90-day

Collaborators and Investigators

This is where you will find people and organizations involved with this study.

Investigators

  • Study Chair: Bryan Williams, MD, University College, London
  • Study Chair: Gregg Stone, MD, Cardiovascular Research and Education Columbia University Medical Center

Publications and helpful links

The person responsible for entering information about the study voluntarily provides these publications. These may be about anything related to the study.

Helpful Links

Study record dates

These dates track the progress of study record and summary results submissions to ClinicalTrials.gov. Study records and reported results are reviewed by the National Library of Medicine (NLM) to make sure they meet specific quality control standards before being posted on the public website.

Study Major Dates

Study Start (Actual)

October 19, 2017

Primary Completion (Anticipated)

May 1, 2025

Study Completion (Anticipated)

May 1, 2025

Study Registration Dates

First Submitted

May 30, 2017

First Submitted That Met QC Criteria

June 5, 2017

First Posted (Actual)

June 7, 2017

Study Record Updates

Last Update Posted (Actual)

May 10, 2023

Last Update Submitted That Met QC Criteria

May 9, 2023

Last Verified

May 1, 2023

More Information

Terms related to this study

Additional Relevant MeSH Terms

Other Study ID Numbers

  • CRD0447

Drug and device information, study documents

Studies a U.S. FDA-regulated drug product

No

Studies a U.S. FDA-regulated device product

Yes

This information was retrieved directly from the website clinicaltrials.gov without any changes. If you have any requests to change, remove or update your study details, please contact register@clinicaltrials.gov. As soon as a change is implemented on clinicaltrials.gov, this will be updated automatically on our website as well.

Clinical Trials on Hypertension

Clinical Trials on MobiusHD

3
Subscribe